Indonesia, an archipelago of over 17,000 islands under a tropical sun, presents one of the most compelling opportunities in the global solar industry. With a technical solar potential estimated at over 1,200 gigawatts and a government mandate to achieve 23% renewable energy by 2025, the demand for locally produced solar modules is poised for substantial growth.

For the international entrepreneur, this landscape offers immense promise. Unlocking it, however, requires a clear understanding of the legal and operational framework, beginning with the establishment of a Foreign-Owned Enterprise—a PT PMA (Perseroan Terbatas Penanaman Modal Asing).
This guide outlines the strategic pathway for setting up a solar module manufacturing PMA in Indonesia, from navigating legal requirements to ensuring operational excellence with a proven turnkey production line.
Understanding the PMA: Your Legal Vehicle for Investment
A PT PMA is the legal entity required for foreign nationals or corporations to conduct business and generate revenue in Indonesia. Recent regulatory reforms have significantly improved the investment climate, making it more accessible for international business leaders. For solar manufacturing, the government now permits up to 100% foreign ownership, removing a significant historical barrier to entry.
Think of the PMA as the foundational chassis of your business vehicle. It provides the legal structure, compliance framework, and operational license needed to function within the Indonesian economy. Without it, you cannot legally hire staff, import machinery, acquire land, or sell your finished products.
Key Requirements for Establishing a PMA
Successfully registering a PMA involves navigating a structured process overseen by the Indonesia Investment Coordinating Board (BKPM). While the details can be extensive, the core requirements for an investor include:
-
A Minimum Investment Plan: The government requires a capital investment of more than IDR 10 billion (approximately USD $670,000). This figure typically excludes land and buildings and demonstrates a serious commitment to the project.
-
A Clear Business Field: Your PMA must be registered for a specific business activity under the appropriate KBLI code (Klasifikasi Baku Lapangan Usaha Indonesia), the national standard for business classification.
-
A Legal Domicile: The company must have a registered office address in Indonesia.
The registration process itself is now streamlined through the Online Single Submission (OSS) system, which centralizes the application process for business identification numbers (NIB), licenses, and other essential permits.
Navigating the BKPM and the OSS System
As the central gateway for foreign investment, the BKPM’s role is to facilitate, promote, and coordinate investment activities. For a new entrepreneur entering the country, the BKPM and its OSS platform are the primary points of interaction with the government.
The process generally follows these steps:
-
Company Name Approval: The proposed company name must be approved by the Ministry of Law and Human Rights.
-
Deed of Establishment: A notary prepares and registers the company’s articles of association.
-
OSS Registration: The investor submits the application through the OSS system to obtain a Business Identification Number (NIB), which serves as the company’s primary identity and replaces several previous registration documents.
-
Securing Business Licenses: Depending on the business sector’s risk profile, additional licenses and permits are required. Solar manufacturing, which involves industrial processes, will necessitate specific operational and commercial licenses.
Engaging experienced local legal and business consultants is highly advisable to ensure this process is handled correctly and efficiently. They can navigate the nuances of document submissions and interactions with government agencies, saving valuable time and preventing costly errors.
The Strategic Importance of Local Production: TKDN
A critical concept for any manufacturer in Indonesia is the Local Content Requirement, or TKDN (Tingkat Komponen Dalam Negeri). Government-sponsored projects and many state-owned enterprise tenders require products to contain a certain percentage of locally sourced components or value-add, a figure that is often around 40% for solar projects.
By establishing a solar panel manufacturing plant in Indonesia, your business is immediately positioned to meet these TKDN requirements. Assembling modules locally—using imported cells but local glass, frames, and labor—allows your products to qualify for projects that foreign importers cannot access. This provides a significant and durable competitive advantage.
Securing Land and Building Your Facility
Once the PMA is legally established, the next practical step is securing a location for the factory. Foreign-owned PMAs cannot directly own land under a ‘Right of Ownership’ (Hak Milik) title. However, they have several secure and commercially sound options:
-
Right to Build (Hak Guna Bangunan – HGB): This is the most common title for industrial use. It grants the right to construct and own buildings on a piece of land for an initial period of up to 30 years, which can be extended.
-
Right to Use (Hak Pakai): This title grants the right to use state-owned or private land for a specific purpose, also on a long-term, extendable basis.
-
Long-Term Lease: Leasing land from a private owner is another viable and often faster option.
Working with a reputable industrial real estate agent is crucial for identifying suitable plots in designated industrial zones. These areas often come with pre-approved permits and access to essential utilities like power and water.

De-Risking the Technical Execution with a Turnkey Production Line
While navigating the Indonesian legal landscape is a business challenge, setting up a high-performance manufacturing operation is a technical one. For entrepreneurs without a deep background in photovoltaic engineering, this can pose the greatest risk in the entire venture. Sourcing machines from multiple vendors, managing integration, and training a new workforce can lead to delays, budget overruns, and quality issues.
This is where a turnkey factory solution becomes a powerful de-risking strategy.
Experience from numerous J.v.G. Technology GmbH turnkey projects globally shows that a fully planned and integrated solar panel production line addresses these challenges directly. Instead of managing dozens of variables, the investor procures a complete, pre-engineered system designed for a specific output and technology.
Advantages of a Turnkey Approach
-
Single Point of Responsibility: One partner handles the design, delivery, installation, and commissioning of the entire production line, eliminating coordination problems between different machine suppliers.
-
Proven Processes: The line is built around established and optimized manufacturing processes, ensuring the factory can produce certified, high-quality modules from day one.
-
Faster Time-to-Market: A turnkey setup significantly shortens the timeline from building completion to the first production run. J.v.G. projects, for example, can often see a new solar module line become operational in under a year.
-
Comprehensive Training: The agreement includes training for local operators and technicians, transferring the necessary knowledge to run the factory efficiently and safely.
By pairing a properly structured Indonesian PMA with a German-engineered turnkey production line, an investor effectively separates and solves the two primary challenges: the legal/administrative and the technical/operational.

Frequently Asked Questions (FAQ)
What is the realistic timeline for setting up a solar factory in Indonesia?
From initiating the PMA process to starting production, a realistic timeline is 12 to 18 months. This includes PMA registration (2-3 months), land acquisition and factory construction (6-9 months), and machinery installation and commissioning (3-4 months).
Do I need a local Indonesian partner?
While not legally required for 100% foreign-owned sectors like solar manufacturing, a trusted local partner or senior manager can be invaluable for navigating business culture, labor relations, and local supply chains.
What are the main operational challenges to consider?
Beyond the initial setup, key challenges include building a reliable local supply chain for components like aluminum frames and glass, navigating logistics and customs for imported materials like solar cells, and training and retaining a skilled workforce.
How much does the machinery for a small-scale factory cost?
The investment required for a solar factory varies with capacity and automation levels. For an entry-level, semi-automated line with a capacity of 20-50 MW per year, the machinery investment typically ranges from USD $800,000 to $1.5 million.
Can my factory produce the latest module technologies?
Yes. Modern turnkey lines are designed to be flexible. A production line from J.v.G., for instance, can be configured to produce modules using the latest cell technologies, such as TOPCon or HJT, allowing your factory to remain competitive.
Your Next Steps
Establishing a solar manufacturing facility in Indonesia is a multi-faceted project that combines legal strategy with technical execution. By understanding the PMA framework and leveraging the security of a turnkey production solution, a foreign investor can build a robust and profitable enterprise in one of the world’s most promising solar markets.
Your journey begins with a detailed feasibility study and a comprehensive business plan. This foundational work ensures that all aspects—from market analysis and financial projections to legal compliance and technical specifications—are aligned for success.







