AlphaESS Launches New Containerized Energy Storage System for C&I Sector
The renewable energy landscape for businesses is taking another significant leap forward. AlphaESS, a leading global provider of green energy storage solutions, has officially announced the launch of its new containerized battery energy storage system (BESS), the Aster TB250/TB500. This robust solution is engineered specifically for the European commercial and industrial (C&I) sector, offering a powerful combination of scalability, safety, and seamless integration.
The announcement, highlighted by industry publications like ESS News and PV Magazine, comes as the demand for reliable and efficient energy storage continues to surge among commercial enterprises.
Unpacking the Aster TB250/TB500: Power and Flexibility of Containerized energy storage
At the heart of this new offering is a design focused on performance and adaptability. The Aster TB250/TB500 is not a one-size-fits-all solution but a versatile system designed to meet diverse C&I energy needs.
Key Specifications:
- Power and Capacity: The system features a rated charging and discharging power of 250–500 kW, with substantial energy capacities ranging from 705 kWh to 1,410 kWh.
- Scalability: For larger operations, the Aster system supports the parallel connection of up to six units. This allows businesses to scale their energy storage up to an impressive 3 MW of power and 8.46 MWh of capacity.
- Advanced Battery Technology: It utilizes high-performance, liquid-cooled lithium-iron phosphate (LFP) batteries, known for their safety and long lifecycle. The entire system is housed within a standard 20-foot container for ease of transport and installation.
- Seamless Integration: A key technical advantage is its compatibility with both 400V and 800V PV systems. As detailed by Finanznachrichten, this enables “seamless integration into diverse electrical infrastructures,” often removing the need for additional costly transformers.
A Commitment to Safety and Reliability of Containerized energy storage
In the world of high-capacity energy storage, safety is paramount. AlphaESS has engineered the Aster TB250/TB500 with a multi-layered protection strategy that extends from the individual battery cell to the entire system.
The system incorporates advanced thermal management to ensure optimal performance and longevity. Furthermore, it is equipped with module-level fire suppression and has successfully passed the rigorous UL 9540A test at the pack level, confirming its ability to effectively contain thermal runaway events. With an IP55 system rating and an IP67 rating for the battery modules, the unit is built to withstand challenging environmental conditions.
Meeting the Evolving Needs of the C&I Sector with Containerized energy storage
The launch of the Aster TB250/TB500 is timely. As businesses increasingly adopt onsite solar generation, the need to store that energy for use during peak hours or when the sun isn’t shining becomes critical. This addresses the core challenge of renewable energy intermittency, making it possible to have solar electricity during the night.
Solutions like this are central to discussions within the industry, such as those happening at the Energy Storage Summit 2026, where the co-location of energy storage with solar PV is a major focus. By enabling businesses to maximize their self-consumption of renewable energy, reduce reliance on the grid, and participate in grid services, the Aster TB250/TB500 empowers them to take control of their energy future.
With this new containerized BESS, AlphaESS reinforces its position as a key innovator, providing the C&I sector with the tools needed to build a more resilient, cost-effective, and sustainable energy infrastructure.



