March 13, 2026

Kosovo solar park: Impressive 9.8 MW Project Inaugurated

Kosovo to Inaugurate 9.8 MW Solar Park in Peja

Kosovo is taking a significant step forward in its green energy transition with the upcoming inauguration of a new 9.8 MW solar photovoltaic (PV) park in Peja. This development marks one of the largest solar installations in the Balkans and underscores the nation’s commitment to diversifying its energy sources, reducing carbon emissions, and aligning with European Union energy goals.

Kosovo solar park Project at a Glance

Located in western Kosovo near the Albanian border, the Peja solar park is a landmark project for the country’s renewable energy sector.

  • Capacity and Generation: The plant has a peak capacity of 9.8 MW and is expected to generate between 14-15 GWh of clean electricity annually. This output is sufficient to power approximately 3,000 to 4,000 households, making a tangible impact on the local energy supply.
  • Scale and Technology: Spanning 20 hectares (about 49 acres), the facility utilizes around 20,000 advanced bifacial solar panels. These panels are designed to capture sunlight from both sides, maximizing energy production.
  • Investment and Development: The project, representing an investment of approximately €12-15 million, was developed by a consortium led by the Turkish firm Çalık Enerji. Crucial funding was provided by the European Bank for Reconstruction and Development (EBRD), the EU’s Western Balkans Investment Framework, and Kosovo’s state-owned transmission system operator, KOSTT.

Strategic Importance for Kosovo solar park

The inauguration of the Peja solar park is more than just an addition to the country’s power grid; it is a strategic move towards a more secure and sustainable energy future.

Kosovo has historically relied on lignite coal for over 90% of its electricity generation, making it one of Europe’s most carbon-intensive energy producers. This over-reliance has led to significant air pollution and energy instability, including frequent blackouts. The new solar park will help mitigate these issues by diversifying the energy mix and reducing annual CO2 emissions by an estimated 10,000 tons.

The project directly supports Kosovo’s National Energy Strategy (2022-2031), which ambitiously targets a 35% share for renewables in the country’s energy consumption by 2031. It also advances Kosovo’s commitments under the Energy Community Treaty and brings it closer to EU integration.

Economically, the solar park has already provided benefits, creating around 100 jobs during its construction phase and offering ongoing roles for maintenance and operation. The electricity generated will be sold to the national grid through a 15-year power purchase agreement (PPA) with KOSTT, ensuring a stable revenue stream and contributing to a more competitive energy market.

A Milestone in a Regional Context for Kosovo solar park

While smaller than massive regional projects like Albania’s 140 MW Karavasta plant, the 9.8 MW Peja park positions Kosovo as a competitive player in the Western Balkans’ rapidly growing solar energy landscape. The region has seen a surge in renewable installations, adding over 500 MW of solar capacity since 2022.

The Peja solar park is a clear milestone, demonstrating Kosovo’s potential to harness its significant solar resources, which average between 1,700 and 1,900 sun hours per year. While challenges such as grid modernization and the long-term phase-out of coal remain, this project is a powerful symbol of progress and a critical building block for a cleaner, more independent energy future.

For further details on Kosovo’s energy initiatives, official announcements from the Kosovo Ministry of Economy and project reports from the EBRD offer in-depth information.

Disclaimer: The information published here is aggregated from publicly available sources. PVknowhow.com does not guarantee the accuracy, completeness, or timeliness of the content. If you identify any incorrect or misleading information, please contact us so we can review and, if necessary, correct it.

Latest PV news

Kosovo Solar News

Kosovo solar park: Impressive 9.8 MW Project Inaugurated

Kosovo solar park: Impressive 9.8 MW Project Inaugurated

Kosovo Solar News

Kosovo solar energy: Impressive 2024 Peja Project Advances

Kosovo solar energy: Impressive 2024 Peja Project Advances

Kosovo Solar News

Kosovo solar energy: Impressive €82M EIB Loan Advances Project

Kosovo solar energy: Impressive €82M EIB Loan Advances Project


You may also like

{"email":"Email address invalid","url":"Website address invalid","required":"Required field missing"}
>