July 26, 2025

Bahamas solar power agreement: 5 MW Solar Plant Marks Incredible Milestone

Bahamas Solar Power Agreement Marks Renewable Energy Milestone on North Andros

The Bahamas has taken a monumental step in its journey toward renewable energy by signing a Power Purchase Agreement (PPA) for a 5 MW solar plant on North Andros. This agreement, formalized by Prime Minister Philip Davis, represents a significant stride towards sustainable energy development for the nation.

North Andros Project Highlights Bahamas Solar Power Agreement

The Power Purchase Agreement, signed between Bahamas Power and Light (BPL) and the Energy Transition Initiative (ETI), symbolizes the country’s concerted efforts to curtail its dependence on fossil fuels. The initiative is the largest solar generation undertaking in the Bahamas to date, as stated in a statement from the Office of the Prime Minister. This project not only underscores the government’s dedication to sustainable development but also aims to significantly lower carbon emissions.

The PPA delineates how BPL will procure electricity from the newly established solar facility, which boasts a capacity of 5 megawatts (MW). The plant is anticipated to considerably diminish the island’s reliance on imported fossil fuels while bolstering the national grid. Prime Minister Davis highlighted the project’s significance in tackling the global energy crisis, noting, “The world is grappling with an energy crisis, and the Bahamas is not immune. The signing of this PPA represents a major step forward in our efforts to diversify our energy mix and secure a more sustainable future for our country.”

Bahamas Power and Light’s Role in the Bahamas Solar Power Agreement

The North Andros Solar Plant is poised to deliver clean and affordable energy to North Andros residents, contributing to the nationwide renewable energy targets. The project is part of a strategic government plan to escalate the renewable energy share in the national energy mix to 30% by 2030, aligning with international climate change commitments.

Bahamas Power and Light (BPL), the state-owned utility responsible for electricity generation and distribution across the Bahamas, will play a pivotal role in integrating the solar power into the national grid. This integration promises a stable and reliable electricity supply for North Andros residents while decreasing reliance on imported diesel fuel.

Beyond environmental advantages, the North Andros Solar Plant is expected to invigorate the local economy by generating jobs during the construction phase and offering long-term employment in operations and maintenance. The government emphasizes the project’s potential to serve as a model for other Bahamian islands, showcasing the viability and benefits of renewable energy initiatives for small island developing states.

Government Commitment Strengthened Through Bahamas Solar Power Agreement

The signing of the PPA is part of the Bahamian government’s broader endeavor to transition towards a more sustainable energy future. In recent years, several policies and initiatives have been rolled out to boost renewable energy usage. These include the Renewable Energy Self-Generation Program, enabling individuals and businesses to produce their own electricity from renewable sources, and incentives for solar panel installations and other renewable technologies.

The Bahamas’ renewable energy commitment is further evidenced by its participation in international initiatives such as the Paris Agreement and the Caribbean Centre for Renewable Energy and Energy Efficiency (CCREEE). By inking the PPA for the North Andros Solar Plant, the Bahamas sends a resounding message to the international community about its dedication to reducing carbon emissions and fostering sustainable development.

For more insights into renewable energy challenges and milestones, you can explore Renewable Energy Barriers: 5 Critical Challenges Revealed in 2025 and Bahamas Solar Power Agreement: 5 Essential Steps to Renewable Energy.

The Bahamas’ advancement in renewable energy with the North Andros 5 MW solar plant is a pivotal progression towards reducing fossil fuel dependence and realizing national renewable energy aspirations while promoting economic growth and environmental sustainability.


More Bahamas Solar News

The Bahamas Solar Power Agreement: A Major Step Toward Renewable Energy Goals The Bahamas has taken a substantial step forward in its

Read More

The Bahamas solar power agreement launches new era of renewable energy The Bahamas has made a significant stride towards a sustainable future

Read More

Bahamas solar power agreement launches 132 MW plant on Andros Island The Bahamas is taking a significant step towards a greener future

Read More

Our PV-Blog Posts

{"email":"Email address invalid","url":"Website address invalid","required":"Required field missing"}
>