Armenia Launches New Armenia solar plant tender for 120 MW Project
Armenia is continuing its ambitious push into renewable energy, launching a significant new tender for a 20 MW solar plant in the Meghri community of Syunik Marz. This initial project is the first phase of a larger plan to develop an additional three plants, bringing the total new capacity in the area to 120 MW. This strategic initiative is poised to substantially reduce national energy production costs, bolster energy security, and accelerate the growth of solar power across the country.
Tender Details and Strategic Importance of the Armenia solar plant tender
The tender, officially published by the Meghri Community Hall, invites proposals for the purchase and installation of a solar plant complete with energy-receiving panels. The key details for interested parties are as follows:
- Procedure Code: Sm-Mh-Ghapzb-25/01
- Reference Number: 129911432
- Submission Deadline: November 18, 2025
This development is more than just an addition of megawatts; it’s a strategic move. Locating these plants in the southern Syunik Marz leverages one of the regions with the highest solar potential in Armenia, which already exceeds the European average. By decentralizing power generation, these projects contribute directly to a more resilient and secure national grid.
A Continuation of Armenia’s Solar Momentum with the Armenia solar plant tender
This Meghri tender is the latest in a series of major solar energy developments, underscoring a consistent national strategy. As of 2024, Armenia’s total installed solar capacity stands at 402 MW, a figure set to grow significantly. This project follows other landmark initiatives, such as the 200 MW utility-scale solar project in the Talin and Dashtadem communities and the successful Aig-1 Armenia solar plant which achieved a 62 MWdc capacity. These large-scale installations, including Armenia’s largest solar plant featuring 114,984 solar panels, highlight the country’s commitment to harnessing its abundant solar resources.
Economic and Energy Security Implications of the Armenia solar plant tender
The goals of the Meghri project are multifaceted. By generating clean, local power, Armenia can decrease its reliance on imported fossil fuels, leading to greater energy independence and more stable electricity prices for consumers. Furthermore, the expansion of the solar sector stimulates economic growth and creates opportunities for local industry.
The increasing demand for solar installations is a catalyst for developing domestic capabilities in solar panel production in Armenia. Establishing a local manufacturing base requires a deep understanding of the basics of manufacturing, including the intricate manufacturing process and the sourcing of essential raw materials. Success in this area depends on investing in the right manufacturing machines and carefully managing the overall plant cost breakdown to ensure competitiveness.
Looking Ahead to Armenia’s Future with the Armenia solar plant tender
The Meghri solar project is a clear indicator of Armenia’s forward-thinking energy policy. By continuing to invest in utility-scale solar, the nation is paving the way for a sustainable and self-sufficient energy future. This trend is comprehensively documented in the latest Armenia Solar News Archives, providing ongoing insights into the market’s evolution. For a deeper dive into market trends, regulations, and investment potential, the Armenia Solar Panel Manufacturing Report offers a valuable analysis.
As Armenia continues to capitalize on its solar boom, the opportunities for investors, developers, and technology providers are expanding rapidly. To gain a deeper understanding of the opportunities in the solar sector, consider enrolling in our free e-course on solar panel manufacturing.



